Sign In | Join Free | My himfr.com
Home > UV Cured CIPP >

Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging

Daoyunai Energy Saving Technology Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging from wholesalers
     
    Buy cheap Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging from wholesalers
    • Buy cheap Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging from wholesalers
    • Buy cheap Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging from wholesalers
    • Buy cheap Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging from wholesalers

    Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging

    Ask Lasest Price
    Brand Name : DAO
    Model Number : D919
    Price : Variable
    Payment Terms : T/T
    Supply Ability : 20 units per month
    Delivery Time : 25 working days
    • Product Details
    • Company Profile

    Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging

    UV CIPP (Cured-In-Place-Pipe) manufactured for city pipe repair without digging

    Regulations on fixing the bottom film:


    The width of the bottom membrane shall be greater than 1/3 of the circumference of the original pipeline, and the length is recommended to be 500mm longer than the original pipeline. If it can be extended to the ground, it is better. The backing membrane shall not be broken and accumulated during the pulling process.


    After the bottom membrane is pulled to the end, it shall be fixed firmly with a wooden square and other items and shall be fixed at the opposite nozzle as far as possible to reserve enough space for the following operations.


    Drag liner material: the material head is locked:


    Before the materials are taken out of the wooden box, a cloth about 3M wide and 7-8m long shall be laid on the ground in advance to protect the materials. Place the material on the cloth when taking it out.

    1. The material shall be horizontally folded in half to an appropriate width, about one-third, and then vertically folded in half by 50 cm (the length of the longitudinal folding can be adjusted appropriately according to the site conditions).

    2. Fold the lifting belt in the middle, and wrap the folded material head with a rope tightener until it cannot fall off (the metal buckle is placed in the middle of the upper part).


    And wrap it with adhesive tape.


    Finally, link the material pulling rope with the lifting belt with shackles and lock it firmly. If the material is long or large, a universal shaft needs to be added in the middle. (universal shaft must be added when dragging materials with steel wire rope.)


    Bottom film1/3 of the pipe size for protecting
    Liner headLocked
    Key pointsslowly and carefully


    Quality Cured-In-Place-Pipe UV CIPP Lining Companies City Pipe Repair Without Digging for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Daoyunai Energy Saving Technology Limited
    *Subject:
    *Message:
    Characters Remaining: (0/3000)