Sign In | Join Free | My himfr.com
Home > CCTV Pipe Crawler >

Robotic CCTV Pipe Crawler Inspection Equipment Robot Special Lifting Frame

Daoyunai Energy Saving Technology Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Robotic CCTV Pipe Crawler Inspection Equipment Robot Special Lifting Frame from wholesalers
     
    Buy cheap Robotic CCTV Pipe Crawler Inspection Equipment Robot Special Lifting Frame from wholesalers
    • Buy cheap Robotic CCTV Pipe Crawler Inspection Equipment Robot Special Lifting Frame from wholesalers
    • Buy cheap Robotic CCTV Pipe Crawler Inspection Equipment Robot Special Lifting Frame from wholesalers
    • Buy cheap Robotic CCTV Pipe Crawler Inspection Equipment Robot Special Lifting Frame from wholesalers
    • Buy cheap Robotic CCTV Pipe Crawler Inspection Equipment Robot Special Lifting Frame from wholesalers
    • Buy cheap Robotic CCTV Pipe Crawler Inspection Equipment Robot Special Lifting Frame from wholesalers

    Robotic CCTV Pipe Crawler Inspection Equipment Robot Special Lifting Frame

    Ask Lasest Price
    Brand Name : DAO
    Model Number : D18
    Price : Variable
    Payment Terms : T/T
    Supply Ability : 500 units per year
    Delivery Time : 15 working days
    • Product Details
    • Company Profile

    Robotic CCTV Pipe Crawler Inspection Equipment Robot Special Lifting Frame

    Special lifting frame of professional pipeline CCTV inspection equipment robot


    Basic requirements of UV CIPP CCTV inspection trenchless technology


    The enclosure of the construction site shall be closed without a gap, and the construction equipment and materials shall not be placed outside the enclosure area.


    The temporary parking area for engineering vehicles and the storage area for testing equipment shall be set in the pipeline testing operation area, and the spacing of each zone shall not be less than 1m. See attached Fig. 32 for the plane layout


    The local repair work area shall be provided with a work vehicle parking area, material stacking area, and tools and equipment storage area. The safe distance between each partition and enclosure shall not be less than 050m. See attached Fig. 3.3 for the plane layout


    The layout of the overall repair work area shall comply with the following provisions a) work vehicle parking area, material stacking area, tool, and equipment storage area, emergency material stacking area, and waste material stacking area shall be set, and the safe distance between each partition and enclosure shall not be less than 0.5m; b) The layout of the operation area and the laying down of facilities shall comply with the figure.


    1 - construction signboard (nine signboards and one drawing); 2. One-shot flashing lamp (for night construction); 3 - traffic bucket; 4 - construction vehicles; 5-6-a warning light (for night construction) in the blanking area of construction operation; 7 - placement of construction equipment; 8 - pipe section to be operated; 9 - emergency materials storage area; 10 - stacking area of construction materials; 11 a traffic cone; 12. Auxiliary vehicles for construction; 13 - temporary stacking area for construction waste; 14 - safety fence


    Function:Lifting CCTV camera
    Temperature:-10°C-55°C
    PowerMotor

    Quality Robotic CCTV Pipe Crawler Inspection Equipment Robot Special Lifting Frame for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Daoyunai Energy Saving Technology Limited
    *Subject:
    *Message:
    Characters Remaining: (0/3000)