Sign In | Join Free | My himfr.com
Home > UV Cured CIPP >

Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging

Daoyunai Energy Saving Technology Limited
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging from wholesalers
     
    Buy cheap Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging from wholesalers
    • Buy cheap Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging from wholesalers
    • Buy cheap Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging from wholesalers
    • Buy cheap Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging from wholesalers
    • Buy cheap Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging from wholesalers
    • Buy cheap Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging from wholesalers

    Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging

    Ask Lasest Price
    Brand Name : DAO
    Price : Variable
    Payment Terms : T/T
    Supply Ability : 300 km per year
    Delivery Time : 15 working days
    • Product Details
    • Company Profile

    Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging

    Wet liner for CIPP UV renovation of underground pipes by no digging method


    Pull the lamp rope with the reserved rope

    The reserved rope and the pull light rope shall be connected with a dead buckle to ensure that they will not fall off accidentally, and the nodes shall be wrapped with adhesive tape. Especially for the rope end of the lamp rope, it is easy to cause the inner membrane to scratch during the dragging process.

    In the process of pulling the lamp rope down into the material with the reserved rope, it must be operated when the material is inflated. Otherwise, it is easy to cause inner membrane damage.


    Lower lamp

    Under the light of the link is the most cause intimal damage. Be careful. Before lowering the lamp, check the lamp wheel, lamp body, and connecting wire for burrs and resin. If any, clean it and treat the wheel smoothly. If it is a headlamp wheel, it is recommended to wipe a small amount of grease to reduce the friction of the material's inner membrane when the headlamp is lifted and lowered.


    During the process of lowering the lamp, it is necessary to ensure that the material bulges up and the lamp enters the material smoothly without obstacles. If it cannot enter smoothly, it is necessary to find out the reasons for the obstacles. It is not allowed to drag or kick. Most of the inner membrane damage occurs at this time. The lamp shall be pulled into the material as far as possible, and sufficient length shall be reserved for the binding head for easy operation to avoid hindering the lifting of the headlamp.


    MaterialWet liner
    Technology appliedTT
    LengthAny length is possible

    Quality Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Daoyunai Energy Saving Technology Limited
    *Subject:
    *Message:
    Characters Remaining: (0/3000)