Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | DAO |
Price : | Variable |
Payment Terms : | T/T |
Supply Ability : | 10 km per month |
Delivery Time : | 15 working days |
Environment protection material for UV CIPP trenchless construction repair
Characteristics of UV CIPP trenchless repair technology:
The process is applicable to the repair of the circular pipe,
non-circular pipes, and curved pipes, and the repairable pipe
diameter range is DN200~DN1650. The maximum length of one-time
repair can reach 200m, and the variable diameter lining
construction can be carried out within one section;
The construction process of this process does not require
excavation, covers a small area, and has little impact on the
surrounding environment and traffic. It has obvious advantages in
repairing drainage pipelines in areas that cannot be excavated or
streets with heavy traffic;
The construction time of this process is short. After the pipeline
is dredged and flushed, the average curing speed of the inner liner
can reach 1m/min, and the repaired pipeline can be put into use;
The inner liner formed by this process has high strength, small
wall thickness, and close-fitting with the original pipeline. In
addition, the inner liner has a smooth surface, no joints, and good
fluidity, which greatly reduces the flow section loss of the
original pipeline;
Compared with the traditional CIPP method, the mechanical
properties of the material are better, and the material used for
structural repair of drainage pipeline only needs less than half of
the thickness of the water turnover; No wastewater is produced in
the solidification process;
Compared with other trenchless repair methods, UV CIPP has lower
requirements on the technical level of operators. Novices can be
fully qualified for their posts after 3-5 hours of on-site
operation training;
The service life of the repaired process can reach at least 50
years;
The whole set of equipment required for UV curing can be carried on
a repair vehicle, reducing the space occupied by the repair
construction on the road surface.
How | Trenchless construction |
Application | Private sewers |
Length | Any length is possible |
![]() |